#10 ◱ Some progress on the North wall. It got better scaffolding later in the week.
#11 ◱ The windows are waiting to be installed. The road was closed to Laie on both sides so the contractor couldn't get to Laie. He tried for four hours.
#12 ◱ This time they have a jack hammer to dig. :-)
#13 ◱ Looking for the connection on the North side and hoping to find copper.