The home repair begins - 2015-01-15 - Pillars
Links: [back] [home] Picture size (pictures per line):
Loading Images ...
Enjoy!
#1
◱ The workers arrive. Carl Minks & Matt Long
#2
◱ SW pillar. They take a hold of the cracks and pull to see what they are up against.
#3
◱ SW pillsr. All this falls off.
#4
◱ NW pillar. Carl working on the post.
#5
◱ NW pillar. The original mix of water and concrete was too dry in parts.
#6
◱ NW pillar almost gone.
#7
◱ First workers: Matt Long and Carl Minks.
#8
◱ SW pillar is down.
#9
◱ NW pillar at bottom.
#10
◱ SW pillar. Cement dust flying as cutting happens.
#11
◱ The mix is being delivered onto the front driveway.
#12
◱ The view of the mix from above.
#13
◱ The pillar workers have arrived.
#14
◱ Organize and mix it up.
#15
◱ Fun driveway.
#16
◱ NW pillar. Blocks getting ready.
#17
◱ NW pillar. Partially finished post. Filled with grout.
#18
◱ Driveway with SW pillar hasn't been done yet.
#19
◱ View from afar.
#20
◱ NE pillar mostly finished.
#21
◱ NE pillar mostly finished.
#22
◱ NE pillar mostly finished.
#23
◱ NE pillar mostly finished.
#24
◱ NE pillar mostly finished.
#25
◱ NE pillar mostly finished.
#26
◱ NE pillar mostly finished.
#27
◱ NW pillar mostly finished.
#28
◱ NW pillar mostly finished.
#29
◱ NW pillar mostly finished.
#30
◱ NW pillar mostly finished.
#31
◱ NW pillar mostly finished.
#32
◱ SW pillar progress.
#33
◱ SW pillar progress.
#34
◱ SW pillar progress.
#35
◱
#36
◱ SW pillar progress.
#37
◱ SW pillar progress.
#38
◱ SW pillar progress.
#39
◱ Tools of the trade. Trowel. Block.
#40
◱ Breaking open a bag of cement to mix with the sand and gravel.
#41
◱ SW pillar progress.
#42
◱ Cutting the top block for the SW pillar.
#43
◱ Cutting the top block for the SW pillar.
#44
◱ Cutting the top block for the SW pillar.
#45
◱ SW pillar grout.
#46
◱ SW pillar adding rebar to the grout.
#47
◱ SW pillar.